Twelve Days Shut, No Calls Missed: Planning a Festive Break That Keeps Its Promises

Hings Ltd
Twelve Days Shut, No Calls Missed: Planning a Festive Break That Keeps Its Promises

The Christmas shutdown is usually written for the people inside the building. A note goes on the staff noticeboard, the alarm is set, and everyone goes home. The people who most need the dates, however, are outside: the customer with a January deadline, the haulier with a pallet to collect, the supplier waiting on a signature before the new year.

A shutdown plan is a customer-service document. Handled as one, it protects orders and goodwill. Handled as an internal memo, it quietly loses both.

Fix four dates, not one

Most firms publish the day they close. Fewer publish the day they reopen, and fewer still publish the two dates that matter to a buyer: the last day a despatch will leave the building, and the first day a collection will be made.

Those four dates should be settled by the end of the first week of December and checked against the calendar of every carrier you use. Parcel networks, pallet networks and dedicated hauliers rarely stop on the same day, and the last collection is often earlier than the last despatch. A promise of delivery before Christmas is worth nothing if the van has already gone.

Christmas Day falls on a Friday this year, with the substitute bank holiday on Monday 28 December. That arrangement pulls the working weeks at either end into unusual shapes, and it is worth asking each carrier, in writing, whether 24 and 31 December count as normal working days. Keep the reply.

Publish the dates where buyers actually look: the website header, the footer of every quotation, the email signature and the voicemail greeting. A single page linked from the homepage — Christmas despatch and collection dates — is better than four separate mentions buried in news items.

The voicemail greeting is a document

An out-of-office reply that says only that the firm is closed for Christmas tells a customer nothing they can plan with. The useful version gives the closing date, the reopening date, the last despatch date, the first collection date, and what will happen to anything ordered in between.

State plainly whether orders placed during the closure will be processed on the first working day or held until a named date. If a skeleton team will be in, say which days and what they can and cannot do. If not, say that too. A clear no is easier to work with than an ambiguous yes.

Name a person, not a department

Give one name, one mobile number and the hours it will be answered. If nobody will answer it, do not imply otherwise. A line such as 'for urgent matters between 24 December and 4 January, ring this number, monitored between 9am and 4pm on working days' is a promise a customer can build a plan around.

The same applies to the emergency contact posted for the alarm company, the landlord and the utility suppliers. A landline that diverts to an unanswered desk is worse than no number at all.

Agree cover upstream

A shutdown is only as quiet as the supply chain allows. Confirm in writing the closure dates of your main suppliers and hauliers, and ask two questions: what stock they are holding for you, and who answers the phone if something fails in the first week of January.

For critical lines, agree a named alternative contact and a trigger for escalation. If you distribute goods, confirm the cut-off for orders that must be fulfilled in December and the date on which normal service resumes. If you import, check port and customs agent availability over the holiday period; a container that lands on 29 December can sit for a week if the agent is closed.

What the building needs

The unglamorous list still matters: alarm and key-holding arrangements, isolation of water and gas where appropriate, refrigeration and temperature monitoring, stock that should not sit over the holiday, and mail that should be redirected or held. Check the insurance policy for any notification requirement if the premises are to be left unoccupied for an extended period. Most festive closures fall well inside a standard 30-day condition, but a longer break, or a closure combined with building works, may not.

Payment runs deserve a line of their own. Invoices that fall due between Christmas and New Year will not pay themselves, and a supplier who has to chase in January remembers it. Either bring the run forward or tell the supplier, in advance, when payment will be made.

What January needs from December

The first working day back should not be spent working out what happened. Nominate one person to clear voicemail and the shared inbox, with a standard reply for orders and a separate route for complaints. Prepare the January despatch schedule before you close, including deposits, credit checks and any orders that depend on a customer's own shutdown.

A short handover note — what is outstanding, who is waiting, what was promised — is worth more than a full inbox.

A short checklist

None of this is difficult. It is simply the difference between a firm that is closed and a firm that is unavailable. Buyers forgive the first. They remember the second.

All Articles

Related Articles

The £40 Phone Call That Saved a £40,000 Order: Small Moments That Make or Break a Deal

The £40 Phone Call That Saved a £40,000 Order: Small Moments That Make or Break a Deal

Reading the Racking: Why a Walk Round a Supplier's Warehouse Beats Any Brochure

Reading the Racking: Why a Walk Round a Supplier's Warehouse Beats Any Brochure

The First Twenty-Four Hours: What to Do When a Supplier Misses the Delivery

The First Twenty-Four Hours: What to Do When a Supplier Misses the Delivery